Shipyard management platform · integrated with SAP Business One

Your entire shipyard, in one place.

From project plan to design, from material request to approval, from subcontractor contract to progress payment, every step is linked in CONNECT. Once a progress payment is approved, the document is ready in SAP Business One.

Request a demo Browse the screens
CONNECT · Dashboard
CONNECT Dashboard: active projects, pending approvals, support requests, personal quick-access shortcuts and recently used screens
10core modules, one user experience
SAP B1progress payment, order and stock integration
200+organisations served by the Sentia Soft team
5 languagesTR · EN · DE · ES · FR interface
PRODUCT TOUR · REAL SCREENS

The very screens used in the yard.

Pick an area and see how CONNECT runs that process.

    END-TO-END FLOW

    From plan to progress payment, one unbroken chain.

    Every record is linked to the step before it. You always know which activity, project, approver and progress payment a material request belongs to.

    1. 01Project planThe MS Project plan is imported; activities, work types and milestones are created.
    2. 02DesignDesign outputs and materials are mapped to activities and transferred to the ERP.
    3. 03Material requestActivity-based warehouse and purchase requests are raised; urgent ones are flagged.
    4. 04ApprovalRequests go to sequential approvers based on amount and location rules.
    5. 05WarehouseMaterial is reserved, picked and transferred; stock is tracked in real time.
    6. 06Subcontractor contractActivity-, contract- or pipe-based contracts, with quotations, budgets and limits.
    7. 07Change and progress paymentChanges are tracked; progress flows into payments and deductions into the calculation.
    8. 08SAP Business OneThe progress payment document and ERP order are created in SAP. No double entry.
    CUSTOMER PORTAL

    Your ship owner works in the same system.

    Your ship-owner customer signs in to CONNECT with their own user and sees only their own project. They follow progress, key dates and the reports they need themselves, without waiting for an email.

    Their project, their accessProject-based authorization means the customer only sees data for their own vessel; other projects and internal processes stay hidden.
    Progress and milestonesActual versus expected progress, the S-Curve and key dates from steel cutting to delivery.
    The reports they want, when they wantThey run the reports shared with them and export to Excel or PDF.
    Owner documentsOwner documents for the project and the after-sales progress report in one place.
    S-Curve report: planned versus actual progress
    Fewer “how is our vessel doing?” emails, a more transparent relationship. Your customer looks at the same numbers you do.
    MODULES

    Everything a shipyard needs, in one menu.

    Explore the modules in detail →

    Role-based access

    Permissions by user, group and project; every user sees only the screens they are authorized for.

    Excel and filters on every screen

    Column filters, saved filters and one-click Excel export are standard on every list.

    Design your own reports

    With the report designer, your team builds new reports without needing developers.

    Notifications and reminders

    Email notifications, pending-approval reminders and in-app instant messaging.

    Interface in five languages

    Turkish, English, German, Spanish and French. Each user picks their own language, so foreign owners and crews work in theirs.

    AI-ASSISTED PLANNING

    Plans change. CONNECT calculates the impact up front.

    A late material or a missing crew becomes visible before it spreads through the plan. CONNECT suggests a reasoned alternative; the final call always stays with your planning team.

    EXAMPLE SCENARIO
    EventProfile delivery is late
    Impact analysisBlock assembly and welding are affected
    CONNECT suggestionMove the crew to outfitting, schedule assembly after delivery
    SENTIA SOFT

    We Listen.

    Every project starts with a question, not a solution. We first listen to your processes, priorities and constraints; only then does the right solution emerge.

    Sentia Soft has delivered solutions to more than 200 organisations across SAP Business One, warehouse automation, e-transformation, bank integration and AI projects. CONNECT is that experience, built for shipbuilding.

    [A short quote from a customer executive about their CONNECT experience will go here.]

    [Full Name] · [Title], [Shipyard]
    Connect — Shipyard Management badge

    See CONNECT in your own shipyard.

    In a short call we’ll listen to your processes and show you, live, the parts of CONNECT that fit you.

    Cevizli Mah. Zuhal Cad. Ritim İstanbul Sitesi A1 Blok No:46a İç Kapı No:90, Maltepe / Istanbul, Türkiye 0216 234 3494 info@sentiasoft.com
    Demo request